Finished Basement
You will need to obtain a building permit if you plan to alter or finish your basement. Your finished basement must comply with all zoning bylaw standards, fire safety, building standards regulations, and building codes .
To apply:
You will need to submit the following information with your completed building permit application:
- 2 copies of the floor plans drawn to scale with metric dimensions
- Proposed layout of the room(s) in your basement
- Designation of the use and dimensions of the proposed rooms
- Details of structural changes, if proposed
- Window sizes and ceiling heights
- Permit fee
- All permits required for electrical or gas work (new connections/lines or changes to existing connections/lines). Contact SaskPower for inspections and permits for gas or electrical work.
View sample basement plans .
