Summer Construction Projects
Information on this page represents planned work for the 2013 construction season. From time to time, the weather or other unforeseen circumstances may require schedule changes. For further information, please check the Daily Road Report or call Service Regina at 306-777-7000.
Roadways
- 10th Avenue
- Location: Retallack Street to Angus Street
- Start Date: Early June, 2013
- End Date: Early June, 2013
- Thin Lift - Concrete replacement sidewalk, curb and gutter. Install pedestrian ramps. Asphalt paving
- This project has been completed.
- 1st Avenue North
- Location: Courtney Street to Dorothy Street
- Estimated Value: $310,000.00
- Start Date: To Be Announced
- Recap - Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving
- View Map
- 7th Avenue North
- Location: McCarthy Boulevard to McIntosh Street
- Estimated Value: $645,000.00
- Start Date: Mid June, 2013
- Recap - Limited concrete replacement sidewalk, curb and gutter. Asphalt milling and paving. Six hydrants
- View Map
- Albert Street
- Location: Gordon Road to West Service Road
- Estimated Value: $116,000.00
- Start Date: Early June, 2013
- End Date: Early June, 2013
- Thin Lift - Concrete replacement sidewalk, curb and gutter. Install pedestrian ramps. Asphalt paving
- This project has been completed.
- Allen Avenue
- Location: King Road to Argyle Road
- Estimated Value: $360,000.00
- Start Date: To Be Announced
- Rebuild/LIP - Concrete replacement curb and gutter. Concrete replacement median, curb and gutter. Asphalt milling with Zipper, installation of weeping tile and paving
- View Map
- Argyle Road
- Location: 25th Avenue to Lakeview Avenue
- Estimated Value: $118,000.00
- Start Date: Early June, 2013
- End Date: Mid June, 2013
- Thin Lift - Asphalt paving
- This project has been completed.
- Broad Street
- Location: Dewdney Avenue to 4th Avenue
- Estimated Value: $425,000.00
- Start Date: Late May, 2013
- End Date: Late May, 2013
- Thin lift - Asphalt paving
- This project has been completed.
- Broad Street
- Location: 23rd Avenue to Bridge
- Estimated Value: $700,000.00
- Start Date: To Be Announced
- Thin Lift - Concrete replacement sidewalk, curb and gutter. Install pedestrian ramps. Asphalt paving
- View Map
- Broad Street
- Location: 100m South of 14th Avenue to Victoria Avenue
- Estimated Value: $1,040,000.00
- Start Date: To Be Announced
- Rebuild - Concrete replacement curb and gutter. Concrete replacement median, curb and gutter. Asphalt milling with Zipper, installation of weeping tile and paving
- View Map
- Broad street
- Location: Wascana Drive to Broadway Avenue
- Estimated Value: $670,000.00
- Start Date: To Be Announced
- Recap - Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving
- View Map
- Broadway Avenue
- Location: Broad Street to Ottawa Street
- Estimated Value: $180,000.00
- Start Date: To Be Announced
- Recap - Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving.
- View Map
- Broadway Avenue
- Location: Ottawa Street to Winnipeg Street
- Estimated Value: $180,000.00
- Start Date: Late May, 2013
- Recap - Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving
- View Map
- Dewdney Avenue
- Location: Rupert Street to Grosvenor Street
- Estimated Value: $290,000.00
- Start Date: To Be Announced
- Recap - Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving
- View Map
- Dewdney Avenue
- Location: Pilot Butte Creek to Prince of Wales Drive
- Estimated Value: $970,000.00
- Start Date: Early May, 2013
- End Date: Mid September, 2013
- Recap - Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving
- View Map
- Fairview Road
- Location: Upland Drive to Broad Street
- Estimated Value: $785,000.00
- Start Date: Late June, 2013
- End Date: Late July, 2013
- Recap - Limited concrete replacement sidewalk, curb and gutter. Catch basin and Man hole rebuilds as required. Poly connections to be replaced. Asphalt milling and paving
- View Map
- Gordon Road
- Location: Lewvan Drive to Albert Street
- Estimated Value: $2,425,000.00
- Start Date: Mid May, 2013
- End Date: Late September, 2013
- Recap - Install four catch basins, three hydrants. Concrete replacement sidewalk, curb and gutter using Slip Form. Asphalt milling and paving
- View Map
- Horace Street
- Location: 4th Avenue to 2nd Avenue
- Estimated Value: $970,000.00
- Start Date: To Be Announced
- Recap - Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving
- View Map
- McIntosh Street
- Location: McIntosh Street from Dewdney Street to 4th Avenue
- Estimated Value: $795,100.00
- Start Date: Mid August, 2012
- End Date: September 5, 2012
- Rebuild catch basin tops. Concrete replacement sidewalk, curb and gutter. Concrete replacement sidewalk, curb and median. Mudjacking sidewalk, curb and gutter. Asphalt milling and paving.
- This project has been completed.
- McIntosh Street
- Location: Sherwood Drive to 9th Avenue North
- Estimated Value: $1,020,000.00
- Start Date: To Be Announced
- Recap - Limited concrete replacement sidewalk, curb and gutter. Catch basin and Man hole rebuilds as required. Asphalt milling and paving
- View Map
- McIntosh Street
- Location: 4th Avenue to 2nd Avenue
- Estimated Value: $290,000.00
- Start Date: To Be Announced
- Recap - Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving
- View Map
- Montague Street
- Location: Montague Street from Gordon Road to Sunset Drive
- Estimated Value: $442,500.00
- Start Date: Mid June, 2012
- Rebuild catch basin tops. Concrete replacement sidewalk, curb and gutter. Hydrant and poly connect installation. Install pedestrian ramps. Asphalt milling and paving.
- This project has been completed.
- Newton Crescent
- Location: Hudson Drive West to Hudson Drive East
- Estimated Value: $1,200,000.00
- Start Date: Mid May, 2013
- Rebuild - Full concrete replacement curb and gutter. Rebuild Catch basins and Man holes as required. Install new Catch basin. Full rebuild of road including installation of weeping tile, sub base, base and pave. Replace four hydrants
- View Map
- Osler Street
- Location: Victoria Avenue to 11th avenue
- Estimated Value: $460,000.00
- Start Date: Mid May, 2013
- End Date: Mid July, 2013
- Recap - Limited concrete replacement sidewalk, curb and gutter. Full replace sidewalk, curb and gutter along 11th Ave. south side between Osler and alley. Replace AC water line as required, replace connections as required. Asphalt milling and paving
- View Map
- Parliament Avenue
- Location: Parliament Avenue from Argyle Road to Montague Street
- Estimated Value: $700,000.00
- Start Date: To Be Announced
- Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving.
- This project has been completed.
- Parliament Avenue area new roads and extensions
- Location: Lewvan Drive to Pasqua Street; Pasqua Street to west of Argyle Street; Queen Street north of Lauback Avenue; 28th Avenue from Queen Street to west of Princess Street.
- Estimated Value: $7,330,000.00
- Start Date: Early May, 2012
- End Date: Late August, 2012
- Upgrades and new road construction. The project will include concrete and paving as well as water and sewer work.
- This project has been completed.
- Queen Street
- Location: Sunset Drive to Laubach Avenue
- Estimated Value: $495,000.00
- Start Date: Mid May, 2013
- End Date: Mid July, 2013
- Recap - Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving
- View Map
- Queen Street
- Location: 2nd Avenue to 1st Avenue
- Estimated Value: $350,000.00
- Start Date: Late May, 2013
- End Date: Mid July, 2013
- Rebuild/LIP - Concrete replacement curb and gutter. Concrete replacement median, curb and gutter. Asphalt milling with Zipper, installation of weeping tile and paving
- View Map
- Rae Street
- Location: 25th Avenue to Hill Avenue
- Estimated Value: $790,000.00
- Start Date: Early June, 2013
- End Date: Late July, 2013
- Rebuild - Concrete replacement curb and gutter. Concrete replacement median, curb and gutter. Asphalt milling with Zipper, installation of weeping tile and paving
- View Map
- Ross Avenue
- Location: Ross Avenue from Park Street to Ring Road
- Estimated Value: $326,400.00
- Start Date: September 10, 2012
- End Date: Late September, 2012
- Rebuild catch basin tops and high traffic tops. Concrete replacement curb and gutter. Mudjacking curb and gutter. Lengthen turning bays on Ross. Asphalt milling and paving.
- This project has been completed.
- Royal Street
- Location: 10th Avenue to Dewdney Avenue
- Estimated Value: $130,000.00
- Start Date: To Be Announced
- Recap - Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving
- View Map
- Shooter Drive
- Location: Truesdale Drive to Helmsing Street
- Estimated Value: $250,000.00
- Start Date: Mid June, 2013
- End Date: Late June, 2013
- Recap - Asphalt milling and paving
- View Map
- Sioux Street
- Location: Ross Avenue to Henderson Drive
- Estimated Value: $210,000.00
- Start Date: To Be Announced
- Recap - Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving
- View Map
- University Park Drive
- Location: Truesdale Drive to Arens Road
- Estimated Value: $550,000.00
- Start Date: Late June, 2013
- End Date: Late June, 2013
- Recap - Asphalt milling and paving
- View Map
- University Park Drive
- Location: Assiniboine to Arcola Avenue
- Estimated Value: $770,000.00
- Start Date: Mid May, 2013
- Recap - Concrete replacement sidewalk, curb and gutter. Asphalt milling and paving
- View Map
- Upland Drive
- Location: Elmview Road to 12th Avenue North
- Estimated Value: $545,000.00
- Start Date: Mid June, 2013
- Recap - Limited concrete replacement sidewalk, curb and gutter. Catch basin and Man hole rebuilds as required. Poly connections to be replaced. Asphalt milling and paving. Two hydrants
- View Map
- Wascana Parkway
- Location: Kramer Boulevard to 23rd Avenue
- Estimated Value: $370,000.00
- Start Date: Early May, 2013
- End Date: Late May, 2013
- Recap - Asphalt milling and paving
- This project has been completed.
- Wascana Parkway
- Location: Wascana Parkway from Grant Road to north of Kramer Blvd.
- Estimated Value: $1,228,870.00
- Start Date: Late May, 2012
- End Date: Early August, 2012
- Rebuild catch basin tops. Concrete replacement along catch basins. Asphalt milling and paving.
- This project has been completed.
- Wells Street
- Location: Dalgleish Drive to Tremaine Avenue
- Estimated Value: $670,000.00
- Start Date: To Be Announced
- Recap - Limited concrete replacement sidewalk, curb and gutter. Catch basin and Man hole rebuilds as required. Asphalt milling and paving. Two connects and three hydrants
- View Map
- Winnipeg Street
- Location: College Avenue to Victoria Avenue
- Estimated Value: $950,000.00
- Start Date: To Be Announced
- Recap/Rebuild - Limited concrete replacement sidewalk, curb and gutter. Full sidewalk replacement on west side only from 15th to 13th. Replace some connections as required. Sewer relining and replacing 160m watermain between 14th and 13th. Rebuild road between 14th & 13th, mill and pave remainder of road
- View Map
Water and Sewer
- Pasqua Street North
- Location: Pasqua Street North and Rochdale Boulevard
- Start Date: April 15, 2013
- End Date: Mid September, 2013
- The City of Regina will continue the water main construction project on Pasqua Street North this year. Construction was delayed last year due to soil contamination. The work includes installing a new water main along the northbound shoulder lane of Pasqua Street North between Pasqua Gate and Rochdale Boulevard
- View Map