Road Maintenance & Construction
lling and upgrading traffic and pedestrian signals to ensure the safety of the travelling public.
Traffic Engineering Provide a safe, efficient and environmentally
sustainable traffic system for the movement of people and goods on City streets. Establish and
maintain technical credibility in preparing and reviewing transportation improvement plans with
Council, Committees of Council, Community Associations and the general public. Develop and maintain
the Traffic Bylaw to be legally sound and enforceable. Improve the transportation system through
changes to traffic signals by installing new signals, changing signal phasing, signal timing, and
progression to improve traffic flow and safety. Prepare parking plans which ensure traffic
operations efficiencies and reflect the needs of neighbouring residences, business operators and
institutions. Ensure the adequacy and effectiveness of all traffic control signs, pavement
markings, expressway lighting and streetlights. Develop and maintain plans and systems to ensure a
safe and accessible environment for all road users including
vehicular, pedestrian and micro mobility (bicycles and e-scooters). Maintain the Red Light Camera
Program which now includes rolling right turn on red light and the Automated Speed Enforcement
Program. Adopted a Vision Zero approach to road safety in 2024 with the goal to reduce all injuries
and fatalities on the road network. Lead and coordinate countermeasures to achieve this goal which
are spread across many internal and external stakeholders. Implement the internal countermeasures
that include but are not limited to traffic calming, enhanced pavement markings, pedestrian
crossing upgrades, traffic signal upgrades, community safety zones, and safety/educational
campaigns. Temporary Traffic Control Manual Residential Road Renewal Program Rules of the Road Road
Report Road Report Standard Construction Specifications Potholes
Regina Transit Master Plan
View the Regina Transit Master Plan.
Food & Yard Waste
ns by a substantial 10,820 tonnes per year. That's equivalent to taking 2,352 cars off the road
each year! Join us in making a positive impact on our environment.
Green Carts begin bi-weekly collection November 2.
Green Carts resume weekly collection April 2027. From April 1 to August 31 elm leaves, branches,
limbs, and stumps are not accepted at the Yard Waste Depot, in accordance with provincial
regulation. Outside of the ban period elm leaves will be accepted at the Yard Waste Depot.
Branches, limbs, and stumps will still not be accepted during this time. Food and Yard Waste Driven
by valuable data and insights gathered from our pilot participants, this citywide service not only
conserves landfill space but also champions a reduction in greenhouse gas emissions. ...
Cultural Plan
The Regina Cultural Plan lays the strategic direction for the development of the city’s artistic and cultural community for the next 10 years.