Grant Incentives
h that! Send us an email at revitalize@regina.ca along with the address, a brief description of the
proposed work (where and what) and we will do our best to help
clarify. I want to complete exterior aesthetic improvements to a mixed-use building or a house-form
commercial building. Can I apply? Yes, mixed-use buildings may apply, provided that the work meets
the eligibility criteria. Residential portions of the property are ineligible under this program. A
house being used as or converted to a commercial property may be eligible under the program.
Home-based businesses do not qualify under the program. Can I apply for incentives over multiple
years? Yes, provided that the proposed project scope or area of work is not currently receiving or
has not received previous municipal incentives. The City will not accept grant applications for
work already in progress before the intake period. If you have already started a major project on
the property and want to apply for a grant to cover additional improvements, that scope of work may
be considered. Where can I find application forms for the programs? Application forms for grant
incentives are available on this page throughout the year. They will ONLY be accepted during the
designated intake periods each year. Pre-application meetings with City officials are also only
available during the intake period. Where do I send my complete application form? A completed
application form and supporting documentation can be sent to revitalize@regina.ca once program
intake is open. Applications received outside of the intake period will not be accepted. I want to
add a vinyl wrap or tint the windows of my business. Is this eligible for funding? No. Any changes
to the building that reduce transparency of doors and windows, including tinted windows and vinyl
wraps, are ineligible under the program. More information on eligible items can be found in the
CCIP Guide. I want to add security cameras, flood lights, fencing, rolling shutters, and window
grills to my property. Are these eligible for funding? No. Features of this nature are ineligible
under the program. More information on eligible items can be found in the CCIP Guide. I want to
purchase solar garden lights from the store to add to my property. Is this eligible for funding?
No. Temporary lighting is not eligible under this program. More information on eligible items can
be found in the CCIP Guide. Storefront Improvement Funding Stream See the FAQs for the Tenant
Fit-up Funding Stream. Can I apply for the Storefront Improvement stream at the same time as the
Tenant Fit-up stream? Yes, new businesses can apply for both the Storefront Improvement and Tenant
Fit-up streams at the same time. If a project meets the criteria, both grants can be used in tandem
for a combined maximum of $100,000 in funding. I want to set up a pop-up or kiosk for the holiday
season. Can I apply for a grant? No, incentives are only available for new Tenant Fit-up projects
demonstrating an intent to lease a space for two or more years. I am an existing business seeking
to renovate the interior of my unit. Can I apply for a grant? No, the intent of the program is to
attract new tenants and activities to existing vacant spaces. I am a new tenant/building owner
planning to renovate a former office space into a restaurant. Can I apply for a grant? Yes,
provided that the proposed work is listed as eligible under the program. Details about the eligible
work can be found in the CCIP Guide. If the unit/building is not intended to be owner occupied, the
tenant must have a primary lease agreement with the property owner. Can I apply for this incentive
over multiple years? No, the Tenant Fit-up stream is intended to support the fit-up of a unit for a
new tenant to use; therefore, it can only be claimed once. Where can I find application forms for
the programs? Application forms for grant incentives are made available on this page before the
designated intake period for applications each year. Where do I send my completed application form?
A completed application form and supporting documentation can be sent to revitalize@regina.ca once
program intake is open. Applications received outside of the intake period will not be accepted.
Tenant Fit-up Funding Stream City Centre Incentive Program Guide (CCIP Guide) Application Forms
Email Updates
Sign up to stay informed on what matters to you! The City
periodically sends email reminders and updates on a variety of
topics.
Pedestrian Safety
Pedestrian safety is a duty shared by motorists and people walking,
but it is ultimately the responsibility of motorists to avoid
hitting people.
Body Rub Establishment Licences
A Body Rub Establishment may operate in specific industrial zones of the City. ...
Advisory - Commercial Phased Permits
Learn more about Commercial Phased Building and Development Permits.
Route 10 Normanview - RCMP
View transit route 10 travelling between Normanview and RCMP.
Route 5 Uplands - Downtown
View transit route 5 travelling between Uplands and Downtown.
Route 16 Lakeridge - Hawkstone
View transit route 16 travelling between Lakeridge and Hawkstone.
Create a Wishlist
Prepare for Registration Day by adding classes to your Wish List.
Commercial Sample Landscape Plan
View a sample landscape plan required for a commercial building permit.
Commercial Sample Site Plan
View a sample site plan required for a commercial building permit.
Researching Residential Properties Guide
For information on property research, reference our Researching Residential Properties Guide.
Foundation Repair
You need to obtain a building permit for all foundation repairs.
Floodplain Management
ct the Floodplain Mapping team at FloodPlainMapping@regina.ca. The flood map may show different
elevation numbers for a property. These numbers help compare the
height of the ground, the expected flood water level and the height that may be needed for future
building. Ground elevation means the height of the ground at the address point shown on the map.
Floodplain Elevation means the highest water level expected during the 1:200-year flood scenario
used for the updated flood maps. This number helps show which areas are in the floodway or flood
fringe. Safe Building Elevation (SBE) means the minimum height that new buildings or additions may
need to meet. It is set 0.5 metres above the Estimated Peak Water Level to help reduce flood risk.
These numbers help show how floodplain rules and flood-proofing requirements may apply to future
development, rebuilding or major renovations on a property. Property owners must continue to follow
the current Zoning Bylaw, Building Bylaw and other applicable regulations when applying for
development or building permits. Some properties may be only partially located within the
floodplain. If any part of a parcel is located within the floodway or flood fringe, the parcel is
considered to be within the floodplain. However, the proposed regulations allow for a property
survey to confirm if a proposed building is subject to further requirements. The Official Community
Plan (OCP) is the City’s long-term planning document that guides how Regina grows and develops. It
includes policies related to land use, infrastructure, transportation, environmental planning and
public safety. The Zoning Bylaw is a set of regulations that controls how land and buildings can be
used and developed within the city. It includes rules related to building locations, property use,
development standards and floodplain regulations. The Building Bylaw establishes construction and
safety requirements for buildings and includes standards related to building permits, inspections
and flood-proofing requirements. In 2025, the provincial government updated the Statements of
Provincial Interest (SPIs) related to floodplains. The updated regulations now allow municipalities
to permit some development within the 1:200-year floodway and provide more flexibility to rebuild
on existing properties, subject to flood-proofing requirements. Before these changes,
municipalities could not allow development or redevelopment within the 1:500-year floodway. More
information about the Statements of Provincial Interest can be found on the Government of
Saskatchewan website:
https://www.saskatchewan.ca/government/municipal-administration/community-planning-land-use-and-development/developing-communities-for-provincial-interest
After approval of the amended floodplain requirements, new development on properties will need to
follow the new rules to ensure buildings meet flood-proofing requirements. Proposed changes
include: New procedures for confirming how high the first floor can be above the ground level.
Restrictions on building a residential unit in a basement. Restrictions and requirements for
mechanical areas, such as furnace and water heaters to be on the main floor, above the safe
building elevation. Requirements for an engineer to approve new residential buildings. Allowing for
non-residential buildings, such as garages to be built on impacted properties within the floodway.
Detailed proposed changes can be found here Property owners must continue to follow the current
Zoning Bylaw, Building Bylaw and applicable regulations when applying for development or building
permits. For existing properties the proposed floodplain regulations are the same for properties
within the floodway or flood fringe. This is consistent with new provincial legislation. New
neighbourhoods are not allowed to subdivide land for development within the floodway. The most
significant proposed change is for existing properties in the floodway. Under the current
regulations, rebuilding a home or adding accessory structures in the floodway is not allowed. Under
the proposed regulation changes, existing properties in the floodway would have more flexibility
for future development, redevelopment or rebuilding, as long as flood-proofing requirements are
met. For an existing property the proposed regulations provide options to allow for basement
development. For new buildings, unless confirmed by an engineer that the basement is built to be
water-tight and withstand floodwaters in the event of a 1:200-year flood, no basement suites will
be allowed within a basement and mechanical equipment (such as furnace and water heaters) will need
to be on the main level, above the safe building elevation. For existing buildings not designed for
a 1:200-year flood, it would not be possible to develop a contained basement suite, but other
basement development, such as living space would be allowed. Yes. There are no restrictions for
buildings that are not primarily intended as habitable spaces, such as garages or sheds. Insurance
coverage and eligibility decisions are determined by individual insurance providers, using their
own assessment data and methods. The City cannot provide direct advice about insurance coverage or
eligibility, as each insurance provider conducts its own risk assessment for properties. Property
owners are encouraged to contact their insurance provider to learn about available coverage options
and eligibility requirements. Some insurers may offer optional coverage related to sewer backup,
overland flooding or groundwater flooding. The City recognizes that flooding concerns can be
stressful for residents and property owners and is committed to protecting property in the event of
a flood through temporary measures, such as temporary sandbagging dikes. Regardless of the measures
that municipalities may take, they may not fully prevent flooding during extreme flood events. No,
your assessment will not change as a direct result of the changes. However, property valuation
occurs every four years in accordance with provincial legislation. The next assessment cycle will
be from 2029 to 2033. At that time, the same factors will be considered for all properties to
determine if changes need to be made. Property owners with questions can contact the City at
FloodPlainMapping@regina.ca. Updates or new information will be available at Regina.ca/FloodPlain.
The City is currently sharing public information to help residents and property owners understand
the updated flood maps and proposed changes. Following this public information process, proposed
amendments to the Official Community Plan, Zoning Bylaw and Building Bylaw are tentatively
scheduled to go to Executive Committee and City Council meetings in fall 2026. The amendments would
then proceed to the Ministry of Government Relations, along with the Official Community Plan
amendments, which may take several months. The proposed floodplain regulation changes will not come
into effect until the required approvals are received. Natural flooding occurs when water covers
land that is normally dry and can affect communities, infrastructure and properties. Flooding
occurs in many areas of Saskatchewan and is one of the natural hazards considered in community
planning and emergency management. Natural flooding does not include sewer backups and basement
leaks. From 2011 to 2022, the Province of Saskatchewan spent more than $200 million through the
Emergency Flood Damage Reduction Program and the Provincial Disaster Assistance Program to support
flood response and recovery efforts across the province. To help communities better understand
flood risks and support future planning and emergency management, the Water Security Agency (WSA),
in partnership with Natural Resources Canada, completed flood mapping studies over the last few
years under the Flood Hazard Identification and Mapping Program. Flood mapping studies identify
areas within communities that may be at risk of flooding and provide a visual representation of
flood risks associated with rising water levels in rivers and lakes. Updated flood maps help
support land use planning, emergency management and flood mitigation planning. The previous flood
maps for Regina were adopted in 1983. WSA recently updated the flood maps using improved data,
modern modelling and updated flood risk assessments to provide a more accurate picture of potential
flooding. To be in alignment with new provincial legislation, the updated maps are now based on a
1:200-year flood scenario, replacing the previous 1:500-year flood model. The updated flood maps
are based on a 1:200-year flood scenario, which means there is a 0.5 per cent chance of this type
of flood occurring in any given year. This does not mean flooding happens once every 200 years. It
means there is a low probability of this type of flood occurring in any single year. The updated
flood maps are now based on a 1:200-year flood scenario, replacing the previous 1:500-year flood
model, which had a 0.2 per cent chance of occurring in any given year. WSA is responsible for
identifying and mapping floodplain areas in Saskatchewan. The City has received updated flood maps
from WSA that identify areas of Regina located within the floodplain, including the floodway and
flood fringe. As a result of the updated mapping, floodplain boundaries within Regina have changed.
The City is responsible for regulating development within the floodplain through the Official
Community Plan, Zoning Bylaw and Building Bylaw. ...