City Planning & Community Development
The City Planning & Community Development division collaborates
with partners and ...
Finding Middle Ground Design Competition
need to be part of the 10-page limit. How specific are the details on products, materials and
equipment needed to be? Is generalized description and key features
or mention of a brand recommended? A generalized description and the key features are sufficient. If you are utilizing new technology that is
proprietary to a specific brand, we recommend that you highlight the manufacturer’s name. Do you
want the full contruction cost estimate and the design cost included in the project cost? How
in-depth are you looking for this? A high-level estimate of construction costs that exclude land
costs and any soft costs are all we require. After the deadlines for all question rounds (1 and 2)
will an addendum be sent out to all registered applicants to be made aware of asked/answered
questions or is this only shared amongst those who asked the questions? The questions submitted and
the answers will be posted on our competition website and an email will be sent to all registrants
notifying them that they have been posted. When the dwelling allowable units' states for example:
Min 4. Max 8 - does this mean one development but separate attached units? Like a 4 plex
development for instance? Like a Multi-Unit Development/Townhouses? All units on the lot must be
fully attached. When there are multiple residential buildings on a lot it is considered a Planned
Group, which is a Discretionary Use in most applicable circumstances. Is there any specific zoning
bylaw to determine if the units are feasible to be detached or if attached is a requirement to meet
the density/coverage limits. All applicable zoning regulations can be found in the Zoning Bylaw.
Please clarify the submission package formatting. In the landscaping plan inclusions, does “
elevations (for all cardinal directions)” mean that we are to have all 4 exterior elevations of the
units on the drawing itself? We are asking for 4 exterior elevations (one for each compass
direction) to be included in the submission set. Placement within the submitted documents and the
scale of each elevation is at the discretion of the submitter. Does the landscape plan need to be a
separate document/ drawing sheet? It is up to the participant whether the landscaping plan is
separate or combined with other drawings such as a floor plan. Does the building mass drawing need
to include the footprint of the building in plan view on the landscape drawing showing the building
footprint, overall size and placement? Typically, the massing drawings would be in an isometric
view. ...
Interment & Cremation Information Sheet
Information on booking an interment (burial) of cremated remains at one of the City of Regina’s cemeteries.
Fireplace Submission Details
View the submission requirements for applying for a fireplace permit.
Cross Connection Control Testing and Inspection Report
Cross Connection Control Testing and Inspection Report
Social Media
To provide the best possible
communication, the City of Regina ...
How to Prepare for Registration Day - Create a Wishlist
How to Prepare for Registration Day - Create a Wishlist
Adapted Rec Plan Executive Summary
Adapted Recreation Plan Executive Summary
Licences
The City provides a variety of licences for both business
Advisory - When a Professional Designer is Required
View the planning and development service advisory for when a professional designer is required.
Athletic Field Ball Diamonds and Canada Games Complex Application Form
Use this form to request a booking for a ball diamond, athletic field or the Canada Games Athletic Complex.
I Love Regina 20th Anniversary Terms & Conditions
View the I Love Regina 20th Anniversary Exhibitor Terms & Conditions
Al Ritchie Neighbourhood Planning Program Timeline
View the timeline for the Al Ritchie Neighbourhood Plan