Spray Foam Submission Details
View the submission requirements for applying for a spray foam permit.
Finding Middle Ground Design Competition
need to be part of the 10-page limit. How specific are the details on products, materials and
equipment needed to be? Is generalized description and key features
or mention of a brand recommended? A generalized description and the key features are sufficient. If you are utilizing new technology that is
proprietary to a specific brand, we recommend that you highlight the manufacturer’s name. Do you
want the full contruction cost estimate and the design cost included in the project cost? How
in-depth are you looking for this? A high-level estimate of construction costs that exclude land
costs and any soft costs are all we require. After the deadlines for all question rounds (1 and 2)
will an addendum be sent out to all registered applicants to be made aware of asked/answered
questions or is this only shared amongst those who asked the questions? The questions submitted and
the answers will be posted on our competition website and an email will be sent to all registrants
notifying them that they have been posted. When the dwelling allowable units' states for example:
Min 4. Max 8 - does this mean one development but separate attached units? Like a 4 plex
development for instance? Like a Multi-Unit Development/Townhouses? All units on the lot must be
fully attached. When there are multiple residential buildings on a lot it is considered a Planned
Group, which is a Discretionary Use in most applicable circumstances. Is there any specific zoning
bylaw to determine if the units are feasible to be detached or if attached is a requirement to meet
the density/coverage limits. All applicable zoning regulations can be found in the Zoning Bylaw.
Please clarify the submission package formatting. In the landscaping plan inclusions, does “
elevations (for all cardinal directions)” mean that we are to have all 4 exterior elevations of the
units on the drawing itself? We are asking for 4 exterior elevations (one for each compass
direction) to be included in the submission set. Placement within the submitted documents and the
scale of each elevation is at the discretion of the submitter. Does the landscape plan need to be a
separate document/ drawing sheet? It is up to the participant whether the landscaping plan is
separate or combined with other drawings such as a floor plan. Does the building mass drawing need
to include the footprint of the building in plan view on the landscape drawing showing the building
footprint, overall size and placement? Typically, the massing drawings would be in an isometric
view. Including other elements in the massing drawings is up to the submitter. Round 2 Will schemes
be docked points for not providing onsite parking (i.e. what metrics will be used when scoring
schemes that do and do not provide onsite parking)? While our zoning bylaw has moved away from
parking minimums to suggested parking ratios, the #1 objection from residents the city receives
towards missing middle housing and intensification relates to inadequate parking. Design concepts
that can accommodate a 1:1 parking ratio (1 parking space per unit) on the site will score higher.
If a strong rationale is presented for providing less than the suggested ratio, it may be weighed
more favourably during the review process. For this competition, will two or more residential
buildings (i.e. accessory dwelling units, multi-duplexes, etc.) be allowed on each lot? If not, it
appears that this may significantly limit the development opportunities of each site. In an effort
to explore all potential options for each site, we have revised our position stated in question 9
from the first-round responses and are now accepting proposals for multiple buildings on each lot.
Is there a preferred approach for collecting garbage? ...
Transit Class Trips Terms of Service
View our terms of service for booking a class trip with Regina Transit.
Pickleball Tennis Dropin Times
Drop-in times for Pickleball and Tennis courts
Book a Recreation Facility
Find application forms and booking timelines for our recreation and community facilities.
Servicing Agreement Standard Conditions Manual
The Servicing Agreement Standard Conditions manual should be used in conjunction with any servicing agreements between the City of Regina and applicants for subdivision approval.
Building Permit Application - Secondary Suite
View the Secondary Suite Permit Submission Package.
Maple Leaf Pool Concept Plans
View the Maple Leaf Pool Renewal Concept Plans
Fire Escape Planning
In a fire, you and your family have less than three minutes to
escape and get out safely. ...
mamaweyatitan centre rental application
Complete the rental application form to request a facility booking at the mâmawêyatitân centre.
Culverts
View the Standard Construction Specification for Culverts.
Embankments
View the Standard Construction Specification for Embankments.
Excavation
View the Standard Construction Specification for Excavation.