Indoor Aquatics Facility Opening in 2029
The new Indoor Aquatics Facility is now under construction and set to open in 2029. This will be Regina’s first public year-round pool to include waterslides, a wave pool and a lazy river. These features will be integrated with two 50-metre lane pools and dive towers.
Sandra Schmirler Leisure Centre
- Main pool, tot pool, whirlpool hot tub
- Strength and conditioning room
- Activity room
North West Leisure Centre
- Leisure pool, whirlpool hot tub
- Gym, strength and conditioning room
- Three meeting rooms
Sportplex - Fieldhouse & Lawson Aquatic Centre
- 200m six-lane oval track, four tennis courts and five badminton courts
- 65m pool divided into two, eight-lane 25m tanks
- Two strength and conditioning areas, three classrooms and a cafe
Neil Balkwill Civic Arts Centre
- Specialized studios and open studio space
- Meeting and board rooms
- Art Gallery of Regina