2023-24 Budget Highlights
View the Budget Highlights for 2023-24.
Telecommunication Antenna Systems
Learn about the City of Regina's policies and procedures, as well as federal legislation and involvement, respecting wireless telecommunication development in our city.
Mosquito Report
View the weekly report on mosquitoes.
Property Assessment
Learn how your property's assessment is calculated and about your
assessment notice, the appeal process and more.
Paratransit Policy and Procedure Guide
View the Paratransit Policy and Procedure Guidelines.
Concrete Sidewalk, Crossings, Medians, Curb and Gutter
View the Standard Construction Specification for Concrete Sidewalk, Crossings, Medians, Curb and Gutter.
CMHC Housing Design Catalogue
engineer and compiling the other applicable submission items. Promoting alternative housing options
like backyard suites or triplexes can reduce the price point for
people looking to rent or buy in a residential neighbourhood. It can also benefit residents who
want to supplement mortgage payments with rental income. Designs Available in Regina At this time
the City of Regina is supporting the catalogue designs provided for Saskatchewan and Manitoba:
Backyard Suites – Accessory Dwelling Unit 01 and Accessory Dwelling Unit 02 Multiplex Housing –
Triplex, Fourplex 01 and Fourplex 02, Rowhouse, Sixplex These designs include: Summary packages:
floor plans, visuals and key building details Technical design
packages: full drawing sets (PDF, CAD, BIM), energy reporting and accessible layout options Tools
and guides: resources to support site planning, project budgeting, climate resilience, material
selection and energy efficiency. *These designs are not site-specific, and will be reviewed based
on unique lot needs. The applicant will require a pre-application meeting with City of Regina staff
to discuss site specific needs after a professional has been engaged. All small-scale Housing
Design Catalogue plans will be reviewed by the City of Regina for compliance within typical
timeframes. Standard review times for permits are 10 days for one or two unit buildings, and 20
days for buildings with three or more residential units. The design plans offer a head start by
reducing the likelihood of correction requirements that delay permit approvals. Derived Designs The
Housing Catalogue Designs may also be altered and accepted as a “Derived Design.” Derived designs
are based off the originally accepted designs, but with modifications. Depending on the changes to
the original sets, the updates required to prepare permit-ready drawings may be minimal. After a
design has been approved as a derived design, it can be re-used for approval under the same
conditions. Applicants will require a ‘qualified professional’ such as an architect to assist in
finalizing a ‘Derived Design’ (see Catalogue User Guide) so that they are adapted to unique site
conditions. ...
Advisory - Residential Review Process for Trusses & Other Designs
Review View the process changes for designs beyond the scope of part 9 of the National Building Code.
Mosaic Stadium Rental Application Form
Use this form to request a booking at Mosaic Stadium.
Tennis Court Rental Application Form
Use this form to request a tennis court reservation.