e. The plan involved placing clean soil in the top layer of the construction trench. Follow up
sampling was conducted in November and results will be reported to
the Ministry of Environment. Construction next to the McCarthy Boulevard Pump Station is expected
to be completed in February 2025. Final surface restoration and landscaping will happen in
spring/summer of 2025. Once landscaping and surface restoration is complete, the area directly
affected by the sewer line project will be safe for residents and pets. The next stage of the
Southwest Sewer System Upgrade Project is expected to start in 2025, at the south end of A.E.
Wilson Park. This next phase will pick up where the 2024 project left off by crossing Wascana Creek
and continuing south past Dewdney Avenue. More information about the next stage of the project can
be found by going to regina. ...
Water Outages
part of the City’s Advance Notice Program for planned maintenance of the water system. It is
possible the current outage is an unplanned or emergency report due
to a break. Why is the water cloudy or discoloured after the repair has been made? When water
service is restored, the water may be discoloured and have a slight odour as repairs stir up
sediment from the bottom of the main. This disturbed sediment does not pose a health concern. If
your water is discoloured, it’s recommended you: Check to see if the water is clean by collecting a
sample in a clear container. If the water is not clear within 5 minutes, wait for 30 minutes and
retake the sample. If the water is still discoloured after the second sample, call 306-777-7000.
What happens after the water repair? Upon completion of the repair, the trench will be backfilled
with a temporary mixture and levelled to the surface to make the site safe. Complete restoration of
landscaping, concrete and asphalt affected by water repairs cannot be completed in winter, and may
not by complete until the end of the next summer construction season. If the temporary fix becomes
a concern due to settling or rutting, call 306-777-7000 and we will attend the repair site. What is
the water maintenance repair process? Preparation: 1 to 10 days in advance Issue Detected Utility
Lines Marked Notices Delievered Road Restrictions Requested Maintenance: 1 day Road restriction
setup Water turned off if required Underground work performed (7 a.m. to 4 p.m.) Clean-up: 1 day
Water samples laboratory tested Water turned back on Site clean-up Road restriction removed Water
Tips Road ReportReport a Water Main
Break
Building Permit Application - Backyard Suite
Use this application package to apply for a Backyard Suite.
Application Package - Multi-Unit Dwelling
View the permit application package for a multi-unit dwelling.
Building Permit Application - Single-Family Dwelling
View the Single-Family Dwelling Permit Submission Package.
Lewvan Drive Project
drivability and extending the lifecycle of the road. Lewvan Drive Project Lewvan Drive Project Road
Maintenance & Construction Service Notices Road Report
Record of Decision - APPROVAL
View the Record of Decision - 2151 Anaquod Road
Al Ritchie Neighbourhood Planning Program Timeline
View the timeline for the Al Ritchie Neighbourhood Plan
Hillsdale Neighbourhood Planning Program Timeline
View the timeline for the Hillsdale Neighbourhood Plan
Albert Street Project
ity, drainage and extend the lifecycle of the road. Albert Street Project Albert Street Project
Road Maintenance & Construction Service Notices Road Report
Open House Summary 2340 Windsor Park Road
View the Proposed Development happening at 2340 Windsor Park Road