Success.
Project Outcomes
- replace the concrete medians and sidewalks
- repave the road for a smoother drive
- signal light improvements
- Lead connections will be replaced
- Improved drainage including catch basin and manholes
- Improving pedestrian safety by installing new median pedestrian crossings
Investment
- $2.2 million