Scarth Street Mall Revitalization
l Design Spring Recommended Vision and Conceptual Design to be taken forward to City Council
2025-2026 More detailed design phases to prepare for construction in
2027. Community conversations will continue to inform design refinements. 2027Construction default Contact Us If you have any questions about the Scarth
Street Mall Revitalization Project, please email scarth@regina.ca. Follow our BeHeard Page and
subscribe to receive project updates. BeHeard Page
Office to Residential Conversion
not have taxes or other charges past due to the City. The following are not eligible for this
incentive: Projects located outside the program area;Construction of
new buildings; Properties receiving incentives under other City programs; Projects already underconstruction prior to a complete application being submitted for
consideration under this policy; Projects involving alterations to the exterior of heritage
properties without an approved heritage alteration permit, or involving changes to
character-defining elements that compromise the integrity of the building; or Properties for which
an application is made with taxes or other charges past due to the City are not eligible for
capital grants under this policy until those taxes or other charges are paid. The City may extend a
one-week grace period after the application deadline to allow applicants to pay outstanding taxes
or other past due charges. Relaxation of some of these requirements may be available. Contact
CHS@regina.ca for details. Eligibility Applicants are encouraged to contact the City early at
CHS@regina. ...
Energy Efficiency Compliance Options
View the Energy Efficiency Compliance Options for new buildings and additions.
Design Standard OS-3
View Design Standard OS-3: Multipurpose Athletic Field
Firefighter Jobs
colleges in Saskatchewan, Alberta and Manitoba that offer Firefighter training. To become a
Firefighter, you first must take training that meets the standards
set by the International Fire Service Accreditation Congress (IFASC). To learn more about IFSAC
Training, contact: Fire Etc. Vermilion, ABPhone: 1-800-661-6490 Fax: 780-853-2955
Lakelandcollege.ca Manitoba Emergency Services College Brandon, MBToll Free: 1-888-253-1488 Fax:
204-726-6847 Firecomm.gov.mb.ca Suncrest College Canora, Esterhazy, Fort Qu'Appelle, Melville,
Yorkton, and Kamsack, SKToll Free: 1-866-783-6766SuncrestCollege.ca
Education
Applicants must provide or meet a variety of verification requirements. Applicants must provide
verification of: Grade 12 diploma or GED equivalency. International Fire Service Accreditation
Congress (IFSAC) or Pro Board Certification for National Fire Protection Association (NFPA) 1001
Level I and Level II. ...
Residential Tenancies Regulations
View the Residential Tenancies Regulations.
Water Meters
-runs for commercial properties because the number of meters changes much more frequently than
multi-residential properties. Review a summary of the construction
specifications for water metering equipment. Installing Water Meters in New Buildings Water meters
are installed in every building to track the use of water for billing purposes. Once a building
permit has been issued by the City, an account for water/utility services is created. The building
permit applicant must provide a valid mailing address (not the new building address) for
water/utility bills issued during the time of construction. Water
meters are typically installed near where the water service line enters the property, usually in a
basement. Prior to water use or occupancy, the building permit applicant is responsible for
arranging a water meter installation within a specified timeframe: Single-Family Residential
Buildings (single-metered residential premises with no more than four dwelling units) have six
months from the building permit issue date. Multi-Residential Buildings (single-water metered
premise with five or more dwelling units) have four months from the building permit issue date.
Commercial Buildings (premise in which a business, profession, industry, trade or commerce is
carried out and may have a single or multiple water meter(s) installed) have four months from the
building permit issue date. Review a summary of the construction
specifications for water metering equipment. For more information, please refer to the Water Meter
Installation Guideline. Water Meter Sizing Process Review the Water Meter Sizing Form Guide and
Water Meter Sizing FAQ to determine your water meter needs. Complete the Water Meter Sizing Form.
Print and sign the Water Meter Sizing Form. Scan and email to watermetersizingform@regina.ca, hand
deliver to the main floor in City Hall or mail to: Attention: Water Meter Sizing - Building D 2476
Victoria Avenue PO Box 1790 Regina, SK S4P 3C8 When notified that the form has been approved and
requires a spacer, call Service Regina at 306-777-7000 to arrange a pickup time and location. It is
the responsibility of the building permit applicant to notify the City when construction is complete and turned over to the occupant. This ensures the
building permit applicant/owner is removed from billing. The building permit applicant is billed
based on assumed consumption and charged the assumed consumption rate (See Schedule B of the Regina
Water Bylaw No. ...
General Hospital Walking Tour
Heritage Walking Tour of the General Hospital Neighbourhood.
Alterations, Conversions and Tenant Improvements
buildings or changes to the business activity that result in a new building code occupancy/use or
occupant load require a permit. Even if there is no construction
planned, a building or development permit may be required. The following information will help
prepare your building permit application and make sure it meets the City’s requirements. ...